Lines 5 & 6 Press Pits
Press Line 5 Pit Construction
The project included a 15,000 SF press basement with operating floor deck, bolster rails and utility trenches. Our team also provided miscellaneous metals, roofing, siding, and overhead doors.
The mechanical scope included new piping, ductwork, and fire protection piping. We also installed a new electrical substation, power, lighting, and fire alarm systems.
The project was fast tracked and was completed in six months in conjunction with other subcontractors and vendors working directly for Ford.
Press Line 6 Pit Construction
In addition to a new building, this project included a new 5,000 SF press pit connected to the Line #5 press pit. The extension of the existing gantry crane from Line #4, through Line #5 into Line #6.