Aristeo Construction
Concrete

Ford Motor Company

Vehicle Performance & Electrification Center (VPEC)

Aristeo's Ford Motor Company Vehicle Performance & Electrification Center (VPEC) Project

Aristeo is working on Ford Motor Company’s revolutionary research and testing facility, the Vehicle Performance & Electrification Center. VPEC’s 14 acre campus includes three attached buildings, a wind tunnel that features speeds up to 200 mph, a battery lab that will contain over 180 battery chambers, and a support facility.

Included in our scope of services is:

  • Excavating 240,000 cubic yards of material
  • Placing 22,000 cubic yards of concrete for foundations, floors and walls
  • Fabricating and erecting over 2,100 tons of heavy structural, miscellaneous, and architectural stair steel
  • Executing Aristeo’s largest single concrete pour to date of 3,000 cubic yards, at 400 cubic yards per hour
  • Pouring Aristeo’s largest cast in place wall to date, at 48-foot tall with a 28-foot octagon box out
  • Pouring two double curved contraction walls, at 47 feet and 43 feet tall
  • Erecting Aristeo’s largest ever structural steel project at 1,800 tons

For this project, Aristeo’s teams carefully coordinated the sequencing and scheduling of activities of multiple crews and erection cranes across the job site, allowing the steel to be erected on multiple fronts alongside large concrete pours.

Aristeo teams also provided installation services, installing the main fan and the model motion and pressure management system for the wind tunnel. The entire project is scheduled to be completed in May of 2020 and the project is on schedule for that date.

Location: Georgetown, Kentucky
Owner: Toyota Motor Manufacturing Kentucky
Project Value: $30,000,000
 

TMMK Body Weld Additions

Location: Spring Hill, Tennessee
Owner: General Motors
Project Value: $17,000,000

Rail Cross Dock Building

Location: Spring Hill, Tennessee
Owner: General Motors Corporation
Project Value: $9,500,000

IMN Building Expansion (Design Build)

Location: Spring Hill, Tennessee
Owner: General Motors
Project Value: $5,000,000
 

AAX3 Press Pit

Location: Georgetown, Kentucky 
Owner: Toyota Motor 
Project Value: $65,000,000

Reborn Paint Package

Location: Warren, Michigan 
Owner: General Motors 
Project Value: $18,000,000

Vehicle Engineering Center East Renovation

Location: Pontiac, MI
Owner: General Motors Corporation
Project Value: $2,100,000

Pontiac Stamping Tryout Press Pit

Location: China, MI
Owner: DTE Energy
Project Value: $1,500,000
 

 

Belle River Compressor Unit

Location: Livonia, Michigan
Owner: Ford Motor Company
Project Value: $14,000,000
 

Concrete Slab Project

Location: Wayne, Michigan
Owner: Ford Motor Company
Project Value: $15,000,000
 

Lines 5 & 6 Press Pits

Location: Warren, Michigan
Owner: General Motors
Project Value: $14,000,000
 

Aerodynamics Lab & Reduced Scale Wind Tunnel

Location: Rochester, Michigan
Owner: Oakland University
Project Value: $4,400,000

High Temp Hot Water Tunnels

Location: Detroit, Michigan
Owner: Marathon Detroit Refinery, Fluor Constructors International
Project Value: $17,000,000
 

Greenfield Concrete

Location: Romulus, Michigan
Owner: Wayne County Airport Authority
Project Value: $15,000,000
 

North Terminal Redevelopment

Location: Monroe, Michigan
Owner: Gerdau Special Steel North America
Project Value: $10,000,000
 

Waste Treatment & Rolling Mill Expansion Foundations
Aristeo has worked with Marathon since 2005 and has never had a recordable safety incident on any of our projects. Their dedication to safety and doing work right has made Aristeo a preferred contractor. We are impressed by the service Aristeo provides and will continue to recommend their team on upcoming projects. Marathon Petroleum Company LLC
|